-
Projects
Baosteel Europe
ENVIRONMENTAL DUE DILIGENCE SERVICES FOR BAOSTEEL EUROPE.
Description of the work
Baosteel Europe GmbH intended to acquire a metal production plan owned by Eurometal S.p.a and located in the municipality of Pozzolo Formigaro (Al).Baosteel Europe appointed ambiente s.c. to carry out a preliminary check of the environmental state of the area in order to assess the possible negative condition of the site and, if appropriate, outline the different possible intervention scenarios in relation to the degree of contamination found in the area.
ambiente s.c. services
- Data collection, analysis of the site
- Preliminary investigations
- Chemical analysis
- Geological and hydro-geological model application
- Interpretation of the data
Articulation of activities
In order to verify the potentially compromising environmental conditions of the site and assess the specific contamination values, ambiente sc performed 10 environmental surveys in which soil, subsoil and groundwater samples were taken an analyzed later on in the laboratories.
-
Design and drafting of studies in the fields inherent to the geological and geotechnical aspects
Dispersion models, hydro-geological conceptual models, environmental surveys and geochemistry data analysisCommissioner:
Baosteel Europe GmbH
Start-end year
2013